Customization: | Available |
---|---|
After-sales Service: | Online Service |
Applicable Material: | Carbon Steel |
Still deciding? Get samples of US$ 2600/set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Hydraulic Stainless Steel Tapered Tube Pipe Shrinking Machine End Forming Tube Pipe Reducer Machine Steel Pipe Tube Head Reduce Diameter Machine
The machine is applicable to all types of mechanical high and low pressure tubing, trachea, plumbing, cable connectors, automotive air conditioning pipe, automotive power steering tubes, oil pipe, gasoline pipe, and construction accessories, hot water pipe withhold, widely used in vehicles, Construction machinery, hydraulic machinery, Hange equipment and other industries electric
Model
|
KV-FY51
|
KV-FY61
|
KV-FY71
|
Voltage
|
380v/50hz
|
380v/50hz
|
380v/50hz
|
power
|
4000w
|
4000w
|
5500w
|
greatest pressure
|
31.5Mpa
|
31.5Mpa
|
38Mpa
|
Machinable diameter
|
6-51mm
|
6-70mm
|
6-85mm
|
effectiveness
|
100-200cs/hour
|
150-300pcs/hour
|
200-300pcs/hour
|
weight
|
240kg
|
260kg
|
1000kg
|
size
|
670*430*820mm
|
670*430*1300mm
|
1800*800*1500mm
|
Q:Who are we?
A: We are zhengzhou kovi machinery, a professional machinery manufacturer, more than 98% machine production processes made in our workshop, we can offer complete customized services according to your requirements.
Q: Why you should choose us?
A: We have our own research and development department, several professional engineers, strong customized ability according to customers requests.
Q: What about your warranty?
A: Our warranty is 1 year, and offer full life technology support.
Q: How long we will get the machine?
A: Generally delivery time is 5-7 days if the goods are in stock. or it is 15-25 days if the goods are not in stock, it is according to detailed request.
Q: Are we still need to install the machine after we got?
A: All of machine already testing ready, and all parameter is settled ok before we deliver to you, also we can send you video and manual to teach you how to use the machine.
Q: How can you guarantee we receive a good quality?
A: We have serious inspection process department to control the quality. When the machine was finished, we should send you the inspection video and pictures.
Q: What business terms and payment way we can do?
A: Accepted Delivery Terms: FOB, CFR, CIF, EXW, FCA, DDP, DDU, Express Delivery;
Accepted Payment Currency: USD, EUR, CNY;
Accepted Payment Type: T/T, L/C, Western Union, Cash.